The TeamReadiness® implementation was for an office complex made up of two buildings containing a total of 319,245 net rentable square feet. The focus was on building engineering and security guard operations. Documented procedures included:

Facility Engineering procedures, including:

  • Building Automation System-Electric Heaters
  • Building Automation System-Overview, Core Water Set Point
  • Closed Loop Pump Shut down Procedure
  • Cooling Tower Bundle Refill Procedure
  • Cooling Tower Sump Shut down Procedure
  • Cooling Tower Sump Startup Procedure
  • Domestic Water Shut down and Start up Procedure
  • Emergency Boiler Shut down and Start up Procedure
  • Emergency Electrical Shut down and Start up Procedure
  • Emergency Fire Pump Shut down and Start up Procedure
  • Emergency Generator Transfer Switch Test Procedure
  • Fire Panel Shut-down and Reset Procedure
  • Fire Pump Run Test Procedure
  • Fire Sprinkler System Drain Down Procedure
  • Fire Sprinkler System Refill Procedure
  • Power Outage Awareness for Tenants
  • Power Outage Operations-for Building Staff
  • Spring-to-Winter Changeover- Building Automation System
  • Spring-to-Winter Changeover- Closed Loop, Misc Procedures
  • Spring-to-Winter Changeover- Electric Heaters

Security Guard procedures, including:

  • Asking a Solicitor to Leave the Building
  • Door Locks & Keys Procedures and Chart
  • Emergency Evacuation using the Stairwell Chair
  • Finding the owner of a vehicle
  • Fire Emergency Procedure
  • Parking Violation Notices
  • Proper Conduct and Interpersonal Skills
  • Filling-out and Managing Reports
  • Rounds (Exterior)
  • Rounds (interior by floor and equipment)
  • Security Camera Operations
  • Stalled Elevator Procedure
  • Start and End-of-Shift Procedures
  • Tenant Move-in and Move-out Procedure