Tenant Life Safety & Operations, including:
- Fire Safety Plan - Fire in Your Unit
- Fire Safety Plan - Fire Elsewhere in the Building
- Fire Safety Plan - Building Evacuation Plan
- Emergency Readiness Kit
- Stuck Elevator Procedure and Elevator Operations
Building Engineering Procedures, including:
- Winter-to-Spring Prt 1: Cleaning the Cooling Tower Pipe System Strainer Basket
- Winter-to-Spring Prt 2: Winter to Spring Changeover_Filling the Cooling Tower
- Winter-to-Spring Prt 3: Winter to Spring Changeover_Dual Zone Hydronic Loop
- Winter-to-Spring Prt 4: Changeover from Winter to Summer using Building Automation System
- Winter-to-Spring Prt 5: Activate Cool-down System on Building Automation System
- Winter-to-Spring Prt 6: Overview of Quick Cool-down Plate Exchanger
- Winter-to-Spring Prt 7: Procedure to Activate Chiller
- Winter-to-Spring Prt 8: Dosing Inhibitor into Cooling Tower System
- Winter-to-Spring Prt 9: Procedure to Clear Clogged Chiller Pressure Switch Filter
- Winter-to-Spring Prt 10: Change to Swing Pump if Cooling Tower Water Circulation Pump Fails
- Fire Sprinkler Drain-down Procedure
- Fire Sprinkler Refill Procedure
- High Zone Hot & Cold Water Supply Shut-down Procedure
- Swimming Pool Maintenance Procedure
- Domestic Water Operations
- Hot Water Operations
- Water System Repair Procedure