® implementation was for an office complex made up of two buildings containing a total of 319,245 net rentable square feet. The focus was on building engineering and security guard operations. Documented procedures included:
Facility Engineering procedures, including:
- Building Automation System-Electric Heaters
- Building Automation System-Overview, Core Water Set Point
- Closed Loop Pump Shut down Procedure
- Cooling Tower Bundle Refill Procedure
- Cooling Tower Sump Shut down Procedure
- Cooling Tower Sump Startup Procedure
- Domestic Water Shut down and Start up Procedure
- Emergency Boiler Shut down and Start up Procedure
- Emergency Electrical Shut down and Start up Procedure
- Emergency Fire Pump Shut down and Start up Procedure
- Emergency Generator Transfer Switch Test Procedure
- Fire Panel Shut-down and Reset Procedure
- Fire Pump Run Test Procedure
- Fire Sprinkler System Drain Down Procedure
- Fire Sprinkler System Refill Procedure
- Power Outage Awareness for Tenants
- Power Outage Operations-for Building Staff
- Spring-to-Winter Changeover- Building Automation System
- Spring-to-Winter Changeover- Closed Loop, Misc Procedures
- Spring-to-Winter Changeover- Electric Heaters
Security Guard procedures, including:
- Asking a Solicitor to Leave the Building
- Door Locks & Keys Procedures and Chart
- Emergency Evacuation using the Stairwell Chair
- Finding the owner of a vehicle
- Fire Emergency Procedure
- Parking Violation Notices
- Proper Conduct and Interpersonal Skills
- Filling-out and Managing Reports
- Rounds (Exterior)
- Rounds (interior by floor and equipment)
- Security Camera Operations
- Stalled Elevator Procedure
- Start and End-of-Shift Procedures
- Tenant Move-in and Move-out Procedure