{"id":57,"date":"2009-09-30T11:28:18","date_gmt":"2009-09-30T16:28:18","guid":{"rendered":"https:\/\/teamreadiness.com\/?page_id=57"},"modified":"2011-12-20T15:55:14","modified_gmt":"2011-12-20T20:55:14","slug":"client-one","status":"publish","type":"page","link":"https:\/\/teamreadiness.com\/?page_id=57","title":{"rendered":"320,000 Square Foot Office Complex"},"content":{"rendered":"<p>The TeamReadiness<sup>&reg;<\/sup> implementation was for an office complex made up of two buildings containing a total of 319,245 net rentable square feet.  The focus was on building engineering and security guard operations.  Documented procedures included:<\/p>\n<h2><span style=\"color: #003366;\">Facility Engineering procedures, including:<\/span><\/h2>\n<ul>\n<li>Building Automation System-Electric Heaters<\/li>\n<li>Building Automation System-Overview, Core Water Set Point<\/li>\n<li>Closed Loop Pump Shut down Procedure<\/li>\n<li>Cooling Tower Bundle Refill Procedure<\/li>\n<li>Cooling Tower Sump Shut down Procedure<\/li>\n<li>Cooling Tower Sump Startup Procedure<\/li>\n<li>Domestic Water Shut down and Start up Procedure<\/li>\n<li>Emergency Boiler Shut down and Start up Procedure<\/li>\n<li>Emergency Electrical Shut down and Start up Procedure<\/li>\n<li>Emergency Fire Pump Shut down and Start up Procedure<\/li>\n<li>Emergency Generator Transfer Switch Test Procedure<\/li>\n<li>Fire Panel Shut-down and Reset Procedure<\/li>\n<li>Fire Pump Run Test Procedure<\/li>\n<li>Fire Sprinkler System Drain Down Procedure<\/li>\n<li>Fire Sprinkler System Refill Procedure<\/li>\n<li>Power Outage Awareness for Tenants<\/li>\n<li>Power Outage Operations-for Building Staff<\/li>\n<li>Spring-to-Winter Changeover- Building Automation System<\/li>\n<li>Spring-to-Winter Changeover- Closed Loop, Misc Procedures<\/li>\n<li>Spring-to-Winter Changeover- Electric Heaters<\/li>\n<\/ul>\n<h2><span style=\"color: #003366;\">Security Guard procedures, including:<\/span><\/h2>\n<ul>\n<li>Asking a Solicitor to Leave the Building<\/li>\n<li>Door Locks &amp; Keys Procedures and Chart<\/li>\n<li>Emergency Evacuation using the Stairwell Chair<\/li>\n<li>Finding the owner of a vehicle<\/li>\n<li>Fire Emergency Procedure<\/li>\n<li>Parking Violation Notices<\/li>\n<li>Proper Conduct and Interpersonal Skills<\/li>\n<li>Filling-out and Managing Reports<\/li>\n<li>Rounds (Exterior)<\/li>\n<li>Rounds (interior by floor and equipment)<\/li>\n<li>Security Camera Operations<\/li>\n<li>Stalled Elevator Procedure<\/li>\n<li>Start and End-of-Shift Procedures<\/li>\n<li>Tenant Move-in and Move-out Procedure<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The TeamReadiness&reg; implementation was for an office complex made up of two buildings containing a total of 319,245 net rentable square feet. The focus was on building engineering and security guard operations. Documented procedures included: Facility Engineering procedures, including: Building Automation System-Electric Heaters Building Automation System-Overview, Core Water Set Point Closed Loop Pump Shut down [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":8,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"subpage.php","meta":{"footnotes":""},"class_list":["post-57","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/57","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=57"}],"version-history":[{"count":33,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/57\/revisions"}],"predecessor-version":[{"id":4565,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/57\/revisions\/4565"}],"up":[{"embeddable":true,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/8"}],"wp:attachment":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=57"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}