{"id":312,"date":"2009-12-14T22:33:23","date_gmt":"2009-12-15T03:33:23","guid":{"rendered":"https:\/\/teamreadiness.com\/?page_id=312"},"modified":"2011-12-20T15:56:24","modified_gmt":"2011-12-20T20:56:24","slug":"44-story-high-rise-condominium-building","status":"publish","type":"page","link":"https:\/\/teamreadiness.com\/?page_id=312","title":{"rendered":"44-Story High-Rise Condominium Building"},"content":{"rendered":"<h2><span style=\"color: #003366;\">Tenant Life Safety &#038; Operations, including:<\/span><\/h2>\n<ul>\n<li>Fire Safety Plan &#8211; Fire in Your Unit\n<li>Fire Safety Plan &#8211; Fire Elsewhere in the Building\n<li>Fire Safety Plan &#8211; Building Evacuation Plan\n<li>Emergency Readiness Kit\n<li>Stuck Elevator Procedure and Elevator Operations\n<\/ul>\n<h2><span style=\"color: #003366;\">Building Engineering Procedures, including:<\/span><\/h2>\n<ul>\n<li>Winter-to-Spring Prt 1: Cleaning the Cooling Tower Pipe System Strainer Basket\n<li>Winter-to-Spring Prt 2: Winter to Spring Changeover_Filling the Cooling Tower\n<li>Winter-to-Spring Prt 3: Winter to Spring Changeover_Dual Zone Hydronic Loop\n<li>Winter-to-Spring Prt 4: Changeover from Winter to Summer using Building Automation System\n<li>Winter-to-Spring Prt 5: Activate Cool-down System on Building Automation System\n<li>Winter-to-Spring Prt 6: Overview of Quick Cool-down Plate Exchanger\n<li>Winter-to-Spring Prt 7: Procedure to Activate Chiller\n<li>Winter-to-Spring Prt 8: Dosing Inhibitor into Cooling Tower System\n<li>Winter-to-Spring Prt 9: Procedure to Clear Clogged Chiller Pressure Switch Filter\n<li>Winter-to-Spring Prt 10: Change to Swing Pump if Cooling Tower Water Circulation Pump Fails\n<li>Fire Sprinkler Drain-down Procedure\n<li>Fire Sprinkler Refill Procedure\n<li>High Zone Hot &#038; Cold Water Supply Shut-down Procedure\n<li>Swimming Pool Maintenance Procedure\n<li>Domestic Water Operations \n<li>Hot Water Operations\n<li>Water System Repair Procedure<br \/>\n\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Tenant Life Safety &#038; Operations, including: Fire Safety Plan &#8211; Fire in Your Unit Fire Safety Plan &#8211; Fire Elsewhere in the Building Fire Safety Plan &#8211; Building Evacuation Plan Emergency Readiness Kit Stuck Elevator Procedure and Elevator Operations Building Engineering Procedures, including: Winter-to-Spring Prt 1: Cleaning the Cooling Tower Pipe System Strainer Basket Winter-to-Spring [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":8,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"subpage.php","meta":{"footnotes":""},"class_list":["post-312","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=312"}],"version-history":[{"count":12,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/312\/revisions"}],"predecessor-version":[{"id":4567,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/312\/revisions\/4567"}],"up":[{"embeddable":true,"href":"https:\/\/teamreadiness.com\/index.php?rest_route=\/wp\/v2\/pages\/8"}],"wp:attachment":[{"href":"https:\/\/teamreadiness.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}